Working for Hawkins Construction Co., we installed over 200 30” and 36” diameter shafts, up to 97’ in depth for the overflow facility and later for a new CSO basin. Working adjacent to the Missouri River, all shafts requires temporary casing up to 85’ in length, vibrated to rock.